[Construction Case] Update Work on Sewage Tank for Self-Generation Power Station
This is the first time using a "sewage tank" at the installation site! We propose it from the perspective of work space and work efficiency.
We would like to introduce a case study of the renovation work for a sewage tank. Initially, the drawings provided by the customer indicated that we would perform excavation work using "aluminum sheet piles" and water pressure support with bracing materials. However, considering the work space and efficiency, we proposed the use of "water pressure four-sided beams." While "water pressure four-sided beams" are often used at sites where "combined treatment purification tanks" are installed, this was the first time they were used at a site for installing a "sewage tank." 【Equipment Used】 ■ Aluminum sheet piles ■ Water pressure four-sided beams ■ Bracing catchers *For more details, please refer to the PDF document or feel free to contact us.
- Company:エヌ・エス・ピー
- Price:Other